Skip to content
Back to Root and Run showcase

DemoOak & Stone Remodeling, a fictional business with sample data

Build this
Skip to content

Design-build studio Alder Falls, MN

Call

02Project gallery

Six projects, each drawn before, during and after

We draw every space three times: what was there, what came out and went in, and what we handed back. Switch the stage on any project, or open it for the scope, schedule, budget and selections.

  • Existing wall
  • Removed
  • New framing
  • Water
  • Electrical

Showing 6 projects.

  • Wren Hollow kitchen, after plan: Finished: open kitchen, 9 ft island, pantry wallREFDW15'-6"16'-2"KITCHENDINING9 ft island, seats three1Pantry and coffee bar2Open to the dining room3
    1. 1. 9 ft island, seats three
    2. 2. Pantry and coffee bar
    3. 3. Open to the dining room

    AfterFinished: open kitchen, 9 ft island, pantry wall

    Wren Hollow · 1956 rambler

    Wren Hollow kitchen

    A closed galley opened to the dining room, with a flush beam, a 9-foot island and a pantry wall that hides the refrigerator.

    Budget range
    $95,000 to $110,000
    Duration
    11 weeks of construction
    Scope, timeline and selections
  • Juniper Heights foursquare, after plan: Finished: open kitchen, mudroom, powder roomREFLIVINGENTRY26'-8"KITCHENMUD10 ft island with seating1Mudroom lockers and back entry2Powder room3Wide cased opening4
    1. 1. 10 ft island with seating
    2. 2. Mudroom lockers and back entry
    3. 3. Powder room
    4. 4. Wide cased opening

    AfterFinished: open kitchen, mudroom, powder room

    Juniper Heights · 1918 American foursquare

    Juniper Heights foursquare

    A whole home remodel that moved the kitchen into one open room with the family table, added a mudroom and powder room, and brought the wiring and heating into this century.

    Budget range
    $385,000 to $420,000
    Duration
    7 months of construction
    Scope, timeline and selections
  • Cedar Terrace primary bath, after plan: Finished: curbless shower, freestanding tub, double vanity12'-4"10'-10"PRIMARY BATHCurbless shower, linear drain1Freestanding tub by the window272 in. double vanity3Heated tile floor4
    1. 1. Curbless shower, linear drain
    2. 2. Freestanding tub by the window
    3. 3. 72 in. double vanity
    4. 4. Heated tile floor

    AfterFinished: curbless shower, freestanding tub, double vanity

    Cedar Terrace · 1987 two-story

    Cedar Terrace primary bath

    An alcove tub and a linen closet became a curbless shower, a freestanding tub by the window and a 72-inch double vanity over a heated floor.

    Budget range
    $62,000 to $70,000
    Duration
    6 weeks of construction
    Scope, timeline and selections
  • Marren Lake lower level, after plan: Finished: family room, bar, guest suite and bathWHREFTV31'-8"FAMILY ROOMGUEST SUITEWet bar with a beverage fridge1Media wall2Egress window and well3Three-quarter bath4
    1. 1. Wet bar with a beverage fridge
    2. 2. Media wall
    3. 3. Egress window and well
    4. 4. Three-quarter bath

    AfterFinished: family room, bar, guest suite and bath

    Marren Lake · 2004 walkout

    Marren Lake lower level

    An unfinished basement turned into a family room with a media wall, a wet bar and a guest suite with its own bath and an egress window.

    Budget range
    $118,000 to $132,000
    Duration
    11 weeks of construction
    Scope, timeline and selections
  • Stonebridge primary suite, after plan: Finished: primary suite, bath and walk-in closetHALLLIVINGPRIMARY SUITE480 sq ft suite1Walk-in shower and double vanity2Walk-in closet3Opening to the original hall4
    1. 1. 480 sq ft suite
    2. 2. Walk-in shower and double vanity
    3. 3. Walk-in closet
    4. 4. Opening to the original hall

    AfterFinished: primary suite, bath and walk-in closet

    Stonebridge · 1972 rambler

    Stonebridge primary suite

    A 480-square-foot primary suite added off the back of a one-story house, with a walk-in shower, a double vanity and a walk-in closet.

    Budget range
    $265,000 to $290,000
    Duration
    5 months of construction
    Scope, timeline and selections
  • Old Mill hall bath, after plan: Finished: refinished tub, hex floor, vanity with drawers8'-6"8'-6"HALL BATHTiled niche1Refinished cast iron tub2Vanity with drawers3Hex mosaic floor4
    1. 1. Tiled niche
    2. 2. Refinished cast iron tub
    3. 3. Vanity with drawers
    4. 4. Hex mosaic floor

    AfterFinished: refinished tub, hex floor, vanity with drawers

    Old Mill District · 1928 bungalow

    Old Mill hall bath

    A 1928 hall bath refreshed around its original cast iron tub: hex mosaic floor, a tiled niche, a vanity with real storage and a new window.

    Budget range
    $34,000 to $38,000
    Duration
    4 weeks of construction
    Scope, timeline and selections

Projects, homes and budgets shown are sample content for a fictional business. Drawings are illustrations, not construction documents.

Estimate request

Have a space that could work better?

Four short steps: the project, your home, budget and timing, and how to reach you. You get a rough planning range right away, and a designer calls within one business day.

Built by Root and Run

Want something like this for your business?

A website and system like this one, set up for your remodeling company with your own services, prices, staff and rules.

Let's build it