Whole home remodels, sequenced so you know every week

When a house needs more than one room, one team designing and building all of it saves months and money. Daniel walks every whole home project before the proposal goes out, and Maren runs the schedule.

Starts at
$150,000
Start to finish
6 to 10 months
On site
4 to 7 months of construction
Juniper Heights foursquare, after plan: Finished: open kitchen, mudroom, powder roomREFLIVINGENTRY26'-8"KITCHENMUD10 ft island with seating1Mudroom lockers and back entry2Powder room3Wide cased opening4
  1. 1. 10 ft island with seating
  2. 2. Mudroom lockers and back entry
  3. 3. Powder room
  4. 4. Wide cased opening
Fig. 01Juniper Heights foursquare, finished plan

AIncluded

What every whole home project includes

  • Existing conditions survey and a full drawing set
  • Structural engineering and steel where needed
  • Electrical service upgrades and rewiring
  • Heating, cooling and plumbing updates
  • Kitchens, baths, flooring and trim throughout
  • A phased plan if you stay in the house
  • A dedicated project manager and site supervisor

BGood, Better, Best

Three levels, one design

Every proposal prices your design at three finish levels. These are the ranges our recent projects landed in; your scope sets where yours falls.

  1. Good

    Essential

    $150,000 to $250,000

    • Kitchen or the bathrooms
    • Flooring on the main level
    • Electrical updates
    • Paint throughout
  2. Better · most chosen

    Signature

    $250,000 to $450,000

    • Open floor plan
    • Kitchen and two baths
    • Rewiring and new ductwork
    • Trim and built-ins
  3. Best

    Bespoke

    $450,000 and up

    • Every room
    • Custom millwork
    • Windows and doors
    • Whole-home lighting control

CTimeline

How long it usually takes

6 to 10 months from the first design meeting to move-in, including 4 to 7 months of construction. Permits and custom orders are the usual reasons a schedule moves, and we tell you as soon as we know.

  1. Design and selections10 wks
  2. Permits5 wks
  3. Demolition3 wks
  4. Rough-in8 wks
  5. Finishes12 wks
  6. Punch list2 wks

About 40 weeks end to end. Typical ranges from past projects, not a commitment: your project manager writes your schedule during design.

DDecisions that move the price

Where the money goes

  • 1

    Stay or move out

    Most families stay for kitchen-only phases and move out for the 6 to 10 weeks of heaviest work. We plan the sequence around your choice.

  • 2

    Behind the walls

    Older houses hide surprises. Every proposal carries a contingency, and unused contingency comes back to you.

  • 3

    Phasing

    Some clients split a whole home plan across two years. We design it all at once so the second phase fits the first.

EProjects

Before, during and after

Juniper Heights foursquare, after plan: Finished: open kitchen, mudroom, powder roomREFLIVINGENTRY26'-8"KITCHENMUD10 ft island with seating1Mudroom lockers and back entry2Powder room3Wide cased opening4
  1. 1. 10 ft island with seating
  2. 2. Mudroom lockers and back entry
  3. 3. Powder room
  4. 4. Wide cased opening

AfterFinished: open kitchen, mudroom, powder room

Juniper Heights · 1918 American foursquare

Juniper Heights foursquare

A whole home remodel that moved the kitchen into one open room with the family table, added a mudroom and powder room, and brought the wiring and heating into this century.

Budget range
$385,000 to $420,000
Duration
7 months of construction
Scope, timeline and selections
Stonebridge primary suite, after plan: Finished: primary suite, bath and walk-in closetHALLLIVINGPRIMARY SUITE480 sq ft suite1Walk-in shower and double vanity2Walk-in closet3Opening to the original hall4
  1. 1. 480 sq ft suite
  2. 2. Walk-in shower and double vanity
  3. 3. Walk-in closet
  4. 4. Opening to the original hall

AfterFinished: primary suite, bath and walk-in closet

Stonebridge · 1972 rambler

Stonebridge primary suite

A 480-square-foot primary suite added off the back of a one-story house, with a walk-in shower, a double vanity and a walk-in closet.

Budget range
$265,000 to $290,000
Duration
5 months of construction
Scope, timeline and selections

FQuestions

Whole home questions

How long does a whole home remodel take?

Most whole home remodels take 6 to 10 months from the first design meeting to move-in: about 8 to 12 weeks of design and selections, 3 to 6 weeks for permits, then 4 to 7 months of construction depending on scope. Your project manager builds a written phase schedule during design. Until then these are typical ranges, not a commitment.

Do we need to move out during the remodel?

For kitchens, baths and basements, almost never. We set up dust walls, protect floors and can help you plan a temporary kitchen. For whole home remodels, many families move out for the heaviest 6 to 10 weeks, and we plan the schedule around it.

What happens if you find something behind the walls?

Every proposal carries a contingency allowance for exactly this. If we open a wall and find something that changes the plan, your project manager shows you photos and a written change order before we continue. Unused contingency is credited back at the end.

Estimate request

Start your whole home estimate

Four short steps: the project, your home, budget and timing, and how to reach you. You get a rough planning range right away, and a designer calls within one business day.

Built by Root and Run

Want something like this for your business?

A website and system like this one, set up for your remodeling company with your own services, prices, staff and rules.

Let's build it